Insights
Notes from the line, not from the brochure
Process limits, quoting arithmetic and BOM problems, written by the people who build the boards. Where a limit exists we say where it is, including the parts of a job we cannot inspect.
Latest6 Nov 20264 min read
01005 placement: what actually limits your yield
The placer is rarely the constraint. Stencil, paste, pad geometry and inspection each cap what 01005 can do on a real line.
Read the note6 Nov 20264 min
The BOM substitution checklist that avoids a re-quote
A BOM that reads correctly can still be unbuyable. These eight checks decide whether the parts arrive as listed or the job stops for approval.
Read6 Nov 20264 min
Why a fifty-piece run costs more per board than five thousand
Fixed costs divided by quantity is most of the answer. The rest is changeover, kitting and inspection, and knowing which one you are actually paying for.
ReadHave a board that does not fit the general case?
Send the Gerber, BOM and centroid. A DFM note and an itemised price come back in writing.
